TY - CONF AB - This paper presents the design and implementation of Accelerated Bridge Construction (ABC) techniques for Bridge 1-438 on Blackbird Station Road over Blackbird Creek. The 50’-0” single span beam bridge acts as Delaware’s first all precast bridge and incorporates the nation’s second Ultra-High Performance Concrete (UHPC) overlay. It illustrates the pros, cons and lessons learned from using ABC techniques for the replacement of Bridge 1-438, with particular attention on UHPC. The paper will also discuss the collaborative efforts between federal and state agencies in producing specifications and plans. AU - Nicholas Dean, Craig Stevens, Jason Hastings DA - 2019/6// DO - 10.21838/uhpc.9645 IS - 1 VL - 2 PB - Iowa State University Digital Press PY - 2019 TI - Accelerated Bridge Construction Methods for Bridge 1-438 Replacement T2 - International Interactive Symposium on Ultra-High Performance Concrete UR - https://www.iastatedigitalpress.com/uhpc/article/id/9645/ ER -