First Complete UHPC Overlay on Cable-Supported Bridge Adds Decades to Deck Service Life

Authors
  • Michael McDonagh (WSP)
  • Sam Boukaram (WSP)
  • Shekhar Scindia (Delaware River and Bay Authority)

Abstract

The Delaware River and Bay Authority (DRBA) recently rehabilitated the entire deck of the two-mile-long northbound Delaware Memorial Bridge using ultra-high performance concrete (UHPC). The top two inches of the concrete deck were replaced with UHPC, in an application often simply called a UHPC overlay, which strengthened, stiffened, and water-proofed the 55-year-old deck. The UHPC is expected to extend the deck service life for another 40 years. This is the first cable-supported bridge with a complete UHPC overlay in North America. Construction was carried out in three phases beginning in September 2022 and ending in November 2023, rehabilitating over 550,000 square feet of deck. The project was preceded by a detailed lifecycle cost analysis followed by a small pilot project which helped guide project decision-making. The lifecycle cost analysis showed a clear economic advantage to performing a UHPC overlay versus deck replacement or placing other overlay products. Revisiting the comparative analysis from a sustainability perspective shows that the UHPC overlay is also the most sustainable solution. The paper will provide an overview of the entire deck rehabilitation process, from the 2018 deck evaluation study through the pilot project, and then present the construction of the full UHPC deck rehabilitation. Recommendations will also be presented on how to improve the work of placing UHPC overlays, especially on large bridges, for the benefit of owners and designers looking to implement this cost-effective and sustainable method of extending bridge deck service life on other projects.

Keywords: UHPC, waterproofing, rehabilitation, construction, sustainability

How to Cite:

McDonagh, M., Boukaram, S. & Scindia, S., (2026) “First Complete UHPC Overlay on Cable-Supported Bridge Adds Decades to Deck Service Life”, International Interactive Symposium on Ultra-High Performance Concrete Papers 4(1): 25, 1-8. doi: https://doi.org/10.21838/uhpc.25649

Downloads:
Download PDF
View PDF

166 Views

74 Downloads

Published on
2026-06-13

Peer Reviewed